Frequently asked questions
The building location has moved in response to community and Heritage NSW feedback with consideration for both visual amenity and site constraints.
The existing building cannot be upgraded or replaced in the same location because it does not meet the design, capacity and functionality requirements for the project. The existing location also has a number of site constraints such as land ownership, underground utilities and mature trees.
Changes to the project timeline have been influenced by site constraints, concept design changes informed by feedback from the initial Section 60 application, and the need to progress the project in-line with approvals and available funding.
The project is proposed to be delivered in stages as funding becomes available. Stage 1 includes 2 changerooms, storage, an umpire changeroom, and public toilets. Stage 2 will include 2 additional changerooms with toilets and showers in a separate building. There are currently no changeroom facilities within the existing amenities block.
Greater Sydney Parklands has revised the concept design following feedback from the local community and Heritage NSW. The revised location has been carefully considered in close consultation with Heritage NSW to ensure significant views are retained within the landscape, and the bulk and scale of the building is appropriate for the parkland context.
Greater Sydney Parklands consulted the community on the revised concept design between 18 May and 14 June 2026. This consultation period provided opportunities to participate online and in-person with a pop-up session hosted at Moore Park on 30 May 2026.
Local residents were notified via a letterbox drop and park signage, and Greater Sydney Parklands consulted directly with key stakeholders.
Extensive community consultation also occurred in 2015-16 as part of the Moore Park Master Plan 2040, which identified the need for a new facility at the field.
Greater Sydney Parklands is funding this project with support from the Office of Sport and AFL NSW/ACT. These partners are working with Greater Sydney Parklands to help deliver improved community sport facilities and support women and girls' participation in sport.
A Review of Environmental Factors and Section 60 application to Heritage NSW are required as Moore Park is listed on the NSW State Heritage Register.
Community safety and accessibility have been considered as part of the design. Safety measures include security lighting and the closure of the facilities after hours to minimise antisocial behaviour. Accessible path connections are provided into the facility via the South Dowling Street pedestrian path.
Parking access will not change, with parking provided at Moore Park Golf and surrounding streets. Bike racks are provided to support cycling, with light rail and bus stops a short distance away.
No. This project was identified in the Moore Park Master Plan 2040. You can read about the Moore Park South project here.
The future use of the existing building will be reviewed, including as part of an update to the Moore Park Master Plan 2040.
Two small trees are planned to be removed as part of the project and will be replaced with new trees. Minor vegetation to be removed will be reinstated with native vegetation as part of the construction.
There will be minimal disruption to park users, commuters and neighbouring residents during construction. Signage will be on display around the site to provide project updates.
Field use will continue during construction with minor modifications to create a safety buffer around the construction zone.
Public toilets will be available for general public use. Changeroom facilities will operate in line with sports field bookings.
Subject to approvals, work is expected to commence in late 2026 and be completed in 2027. Greater Sydney Parklands will keep the community informed as the project progresses.
The 2 temporary changerooms will be removed once the new permanent changeroom facilities are available.